Bid Form

Contractor’s Details

Having carefully examined the Contract Documents covering:

(Insert a brief description of the work being performed), located at (Insert job site address), said documents prepared by (name of architect, engineer or person preparing the drawings and/or construction documents for the project), and dated 9date of documents), having familiarized ourselves with the site and job conditions; and having examined and approved the form of the Construction Contract; the undersigned does hereby tender the following bud for the performance of all work in accordance with said Contract Documents.
2. Alternate Bids added or deducted costs for alternatives:
3. Cost of performance and labor and materials payment bond(s), at contractor’s cost.
4. Unit Percentages
5. Completion Time
6. Contract – Bond – Evidence of Insurance
The undersigned agrees to execute and abide by the form of construction contract provided to the undersigned with this bid form and to furnish, at the time of execution of the Contract, (list those items required such as performance and labor and materials payment bond(s) or certificates of insurance).
7. Addenda
8. Changes in the Work
All change orders or “extras”, if any, or any deviation from the contract documents shall be authorized and valid only if approved in writing by (owner’s name). Neither party may waive this provision by acts or conduct.
Date: [183] From:[184] To:[185] Having carefully examined the Contract Documents covering:[210]Having carefully examined the Contract Documents covering:[202]1. Base Bid:[203] Base Bid items listed or description of work being bid:[204]2. Alternate Bids added or deducted costs for alternatives:[215] Item Descriptions listed:[216] ADD:[217] ADD:[218] ADD:[219] Add Total:[220] (DEDUCT):[221] (DEDUCT):[222] (DEDUCT):[223] (DEDUCT TOTAL):[224]3. Cost of performance and labor and materials payment bond(s), at contractor’s cost.(Not included in base bid or contract price).[227]4. Unit Percentages For added (MORE) labor and/or materials, add cost plus %:[229] For added (MORE) labor and/or materials, add cost plus %:[230]5. Completion TimeThe undersigned agrees, if awarded the Contract, to complete all work called for under this Contract within calendar days after being awarded the contract and receiving the written notice to proceed with the work from the Owner. [232]6. Contract – Bond – Evidence of InsuranceThe undersigned agrees to execute and abide by the form of construction contract provided to the undersigned with this bid form and to furnish, at the time of execution of the Contract, (list those items required such as performance and labor and materials payment bond(s) or certificates of insurance).7. AddendaAddenda Number:[238] Date:[239]8. Changes in the Work All change orders or “extras”, if any, or any deviation from the contract documents shall be authorized and valid only if approved in writing by (owner’s name). Neither party may waive this provision by acts or conduct.CONTRACTOR’S LICENSE EXPIRATION DATE:[242] IF CORPORATION, STATE OF INCORPORATION:[243] STATE CORPORATION NUMBER:[244] IF PARTNERSHIP, FULL NAME OF PARTNERS:[245] (Contractor’s Signature):[246] Date:[247]